Contractors who don't know their numbers are flying blind. You might think you're making 30% profit and actually be at 5%. Here's how to track costs and know where you stand.
The Three Cost Categories
Direct job costs: Labor, materials, subcontractors, equipment rental. These vary with each job.
Indirect/overhead costs: Office staff, vehicles, insurance, tools, utilities. These stay relatively constant.
Profit: What's left after all costs.
Material Costs
Every purchase should be coded to a job. Track it in QuickBooks or similar software. At project end, you know exactly what materials cost.
Include the cost of materials that were wasted, damaged, or left on site. That waste is a cost.
Labor Costs
Track hours by job and by task. If a carpenter logs 40 hours at $50/hour fully loaded (wages, taxes, benefits, payroll), that's $2,000 in labor cost for that job.
Many contractors don't know their true loaded labor rate. Calculate it: annual payroll + taxes + benefits + equipment / annual billable hours. That's your real cost per hour.
Subcontractor Costs
Every sub invoice tied to a job. You need to know how much you paid for electrical, plumbing, HVAC, etc.
Equipment and Tool Costs
If you rent equipment for a job, that's a cost. If you use your own equipment, assign a daily or hourly rate. Tool depreciation and maintenance are costs too.
Calculating Gross Profit
Revenue - Direct costs = Gross profit.
If a $100K job costs $65K (materials, labor, subs), gross profit is $35K. That's before overhead.
Overhead Allocation
Office manager salary, vehicle payments, insurance, tools—these don't disappear. Allocate them to jobs. If you have $200K annual overhead and $1M annual revenue, each job carries 20% overhead allocation.
On a $100K job: $35K gross - $20K overhead = $15K net profit. That's 15% margin. Healthy.
The Danger of Low Margins
If your margins are under 10%, you're playing with fire. One bad job, one dispute, one scope creep, and you're losing money. Healthy margins are 15-25% depending on market and risk.
Tracking During the Job
Don't wait until project end to total costs. Review them monthly. If a job is 40% complete and you've spent 50% of the budget, you're behind. Adjust timeline or scope to get back on track.
Real Examples
$100K kitchen remodel: Materials $25K, labor $20K, subs (plumbing/electrical) $30K, equipment rental $3K. Total direct costs: $78K. Gross profit: $22K (22%).
$200K new addition: Materials $60K, labor $50K, subs $70K. Total direct costs: $180K. Gross profit: $20K (10%). Too thin.
Software to Use
QuickBooks, Buildium, or similar construction software. Spend $50-100/month and get real visibility into profitability. It pays for itself the first time you catch a project going south.
The Bottom Line
You can't manage what you don't measure. Track every cost, allocate overhead correctly, and price jobs to meet your profit targets. Contractors with discipline around numbers stay profitable. Contractors who wing it go out of business.